B - Procurement Cycle Management |
B1 - PROCUREMENT PLANNING |
1. Are procurement plans prepared ahead of time as a norm? |
2. Are these plans detailed enough and realistic compared with past history? |
3. Do plans properly consider technical, financial, managerial and implementation constraints? |
4. Does the agency have specialized staff for procurement planning and scheduling? |
5. Are project implementation units adequately staffed with trained procurement, planning, scheduling, expediting and cost estimating personnel? |
6. Is overall planning for complex goods, works and other contracts done in sufficient detail to produce realistic project definition, achievable completion schedules and accurate cost estimates? |
7. Is the early technical and financial planning well coordinated so that projects are fully funded when work needs to begin, based on accurate cost estimates? |
8. Are appropriate methodologies used to plan multiple inter-related procurement activities on large projects (e.g. the critical path method)? |
9. Are project components appropriately packaged for procurement purposes? |
10. Are completion schedules generally met for goods, works and consultant services contracts? If not, what is the major cause for slippage? Is sufficient time generally allowed for external reviews/clearances? |
11. Do procurement units regularly conduct market surveys to update their knowledge of prevailing prices for goods, works and services? |
12. Are procedures and methodologies for planning procurement of recurrent items (i.e. inventory control, forecasting of future requirements, classification, coding, accounting/financial management, spare parts management, and delivery systems) adequate? |
13. In the case of Bank-financed projects, is the agreed procurement plan generally adhered to? |
B2 - PROCUREMENT CYCLE |
1. Is the duration of different phases acceptable? |
2. Who has to intervene and approve different steps and what is the value added by each intervention? Are there any opportunities for simplification, collapsing or eliminating steps? Establish a typical procurement cycle from bid advertisement to award. |
B3 - BIDDING DOCUMENTS |
1. Does the agency have capable staff for preparation of bidding documents? |
2. Is it familiar with Bank procurement policies and Guidelines and with the SBDs to be used in this project? |
3. What is the general quality of documentation produced by the agency? Identify improvements needed. |
4. General quality of technical specifications and drawings, clarity, neutrality, accuracy (including schedules of requirements) and availabilty or access to qualified staff or professional services in this area. |
5. Do standard documents exist for goods, works and consultants contract? List. Are other international contract formats used? If so, identify |
6. Are these documents, if any, readily adaptable to specific contract situations (i.e. by modifications made through a Bid Data Sheet, Special Conditions of Contract or similar)? |
7. Are there separate documents for international and national competitive bidding not financed by the Bank? |
8. Do Instructions to Bidders (ITBs) contain all information necessary to prepare responsive bids and clearly understand evaluation criteria and their method of application? |
9. Do they contain other necessary information, such as eligibility requirements, basis of bid, language and currency of bids, common currency for purposes of evaluation, source and date of the exchange rate, etc.? Are sample forms and other appropriate sections of the documents provided? |
10. Are bidders required to provide bid security in an appropriate amount as a condition of responsiveness of their bid? |
11. Is pre- or post-qualification provided for? |
12. Are qualification criteria appropriate and clearly described? |
13. Are conditions of contract generally equitable? Do they provide adequate coverage for most important commercial and legal issues (for the method of procurement, size, nature and type of contract used) and provide adequate protection to the Government, without putting undue risk on bidders? |
14. Can appropriate provisions for price adjustment be introduced, if needed, and is an adequate system available for indexing the prices of basic contractual inputs (labor, materials, equipment usage)? |
15. Are standard purchase orders used for shopping? |
B4 - PRE-QUALIFICATION |
1. Is pre-qualification carried out when appropriate? What types of contracts is it used for? Works? Goods? Consultants? Other? |
2. Is the pre-qualification process fair and transparent? Are decisions made promptly? Are foreign firms allowed to apply? |
3. Do pre-qualification documents clearly and completely describe all requisites for submitting responsive applications and the qualification requirements? Is financial information required and critically analyzed to assess financial capabilities to perform contracts? |
4. Do procuring entities verify prior to contract award if a successful bidder continues to meet pre-qualification requirements? |
5. Are suppliers required to have a local agent in order to qualify to bid for goods or services? |
6. Do procuring entities maintain updated lists of qualified suppliers, contractors and consultants, and updated market information on commonly procured goods, including spares and consumables? Is supplier, contractor and consultant performance routinely evaluated? Can newcomers readily apply and be qualified? |
B5 - ADVERTISEMENT |
1. Are contracts to be awarded by competitive bidding publicly advertised? |
2. Is sufficient time allowed to obtain documents and prepare bids? |
3. What is the track record of the agency on publishing/updating General Procurement and Specific Procurement Notices? |
B6 - COMMUNICATIONS BETWEEN BIDDERS AND THE PROCURING AGENCY |
1. Are requests for clarifications answered promptly and completely in a written form? |
2. Are clarifications, minutes of the pre-bid conference, if any, and modifications of the documents promptly communicated to all prospective bidders? |
3. Are bidders afforded sufficient time to revise their bids following a modification of the documents? |
4. Do procuring entities maintain accurate records of all communications with the bidders (before and after the deadline for submission)? |
5. Are there communications between the procuring entities and the bidders, other than appropriate requests for clarification of a bid made by the evaluating committee? |
B7 - RECEIPT OF BIDS AND OPENING |
1. Are bids received prior to the deadline securely stored? Where? Who has access? |
2. Are public bid openings conducted? |
3. If so, are they conducted at a specified place closely following the deadline for submission? Generally how long after are they scheduled? Who is invited to attend? |
4. Do bid opening procedures generally follow those specified in the Guidelines? What information is read out at the opening ceremony? Are minutes kept? |
5. Do bid opening procedures differ for goods, works or consultants contracts? If so, how? |
B8 - BID EXAMINATION AND EVALUATION |
1. Are evaluations conducted by qualified evaluating committees? |
2. Are evaluating committees appointed ad hoc for each evaluation? |
3. Is responsiveness determined on the basis of the documentary requirements described in the documents or according to other established practices? If the latter, describe. |
4. Are bid evaluations carried out thoroughly and on the basis of the criteria specified in the documents? |
5. Is the successful bidder's qualification to perform the contract determined solely on the basis of the criteria stated in the documents? (See above) If not, what other criteria are considered? |
6. Are evaluations normally completed within the original bid validity period? |
7. Are bid evaluation reports prepared containing all essential information (i.e. a clear and complete description of the evaluation process, including the reasons for rejecting any bid as non-responsive, how the stated evaluation criteria were applied, and how the successful bidder's qualifications were verified)? |
8. Describe any significant differences between goods, works and consultants evaluations relating to the above |
B9 - CONTRACT AWARD AND EFFECTIVENESS |
1. Are contracts required to be awarded to the lowest evaluated responsive bidder who has been determined to be qualified to perform the contract satisfactorily? |
2. Are negotiations conducted with bidders, before or after selection? |
3. Are additional Government approvals required before contracts can be made effective? |
4. Is performance security required in an appropriate amount and in an appropriate format? |
5. Describe any differences between goods, works and consultants relating to the above |
B10 - CONTRACT ADMINISTRATION |
1. Are there manual or computerized procurement and/or contract monitoring systems in use? Review sample report/output. |
2. Are suppliers and contractors generally paid on time? What is the normal time lapse from invoice submission to final payment? |
3. Are there appropriate procedures to monitor delivery of goods and services to verify quantity, quality and timeliness? Are stores well kept and managed including inventory control of goods? |
4. Are contract changes or variations handled promptly in accordance with the contract conditions and established practice (i.e. change/variation orders are given and/or confirmed in writing, constructive change orders are avoided, unit rates in the contract are honored but the supplier or contractor is allowed to agree to any new unit rates introduced and the completion schedule for each change or variation, etc.)? |
5. Do procuring entities normally make a good faith attempt to resolve disagreements through informal negotiations? (Amicable Settlement). |
6. If this fails, are the resulting disputes handled in accordance with the contract conditions? |
7. Are supplier, contractor and consultant claims handled fairly based on a clear recognition of both parties' obligations under the contract? |
8. Are works contracts supervised by independent Engineers? Does an employee of Employer act as Engineer or Project Manager in some cases? |
9. Are contract managers/administrators skilled in resolving problems in a timely manner and dealing with unforeseen circumstances arising during the life of the contract? Do they adequately document all actions of contractual import taken by the purchase/employer during implementation? |
10. Are contractual remedies utilized only when appropriate and in accordance with the contract conditions? |
11. Are contracts generally completed on schedule and within the originally approved contract price? Or are cost and time overruns frequent? If so, in which sectors and for which particular kinds of contracts? Are fair final acceptance procedures used and certificates issued in a timely fashion? How frequently are contracts extended or amended? |
12. Are contracts generally administered in a fair and equitable manner (e.g. the purchaser/employer/client grants extensions of time when delays are attributable to its untimely action, fair compensation is provided to offset additional costs caused by its mistakes, etc.) |
13. Are under-inspection, over-inspection and/or improper rejection of goods, materials or methods of carrying out the works a common problem? |
14. Are disruptions of the supplier's, contractor's or consultant's orderly performance common, i.e., does the purchaser, employer or client supply all the goods, materials and labor and data it agreed to supply under the contract and carriy out all inspections in a timely fashion? |
15. Can any of the improper contract administrative practices identified above, be attributable to a problem identified in the local procurement environment? Specify |
16. Are procurement evaluations/audits conducted? If so, describe scope, frequency, who carries them out, etc. |
17. Are final payments and contract final closure efficiently handled? |