The following documents are identified as either MS-Word or MS-Powerpoint files |

| Module 1: Introduction and Overview (MS-Powerpoint 1.7 MB) |

| Module 2: Compliance Monitoring (MS-Powerpoint 325 KB) |

| Module 3: Long-Term Asset Modeling (MS-Powerpoint 228 KB) |

| Module 4: Changes Required for Implementing PMMRÂ (MS-Powerpoint 362KB) |

| Module 5: Sample Bidding Document of the World Bank (MS-Powerpoint 440 KB) |

| Case Study 1: Argentina (MS-Powerpoint 580 KB) |

| Case Study 2: Uruguay (MS-Powerpoint 2.4 MB) |

| Case Study 3: Demark (MS-Powerpoint 1.5 MB) |

| Case Study 4: Micoenterprises (short presentation)Â (MS-Powerpoint 909 KB) |

| Case Study 4: Micoenterprises Worksheets (MS-Word 21 KB) |

| Case Study 5: Lebanon (MS-Powerpoint 2.6 MB) |

| Workshop 1: Development of Performance Standards and Response Times (Presentation) (MS-Powerpoint 127 KB) |

| Workshop 1: Development of Performance Standards and Response Times (Worksheet) (MS-Word 28 KB) |

| Workshop 1: Development of Performance Standards and Response Times (Table) (MS-Word 32 KB) |

| Workshop 2: Introduction (MS-Powerpoint 70 KB) |
 | Workshop 2: Development of a Strategy of Implementing PMMRÂ (MS-Word 24 KB) |
 | Workshop 2: Implementation Sheets (MS-Word 24 KB) |
 | Thailand Certificate (MS-Powerpoint 1.7 KB) |
 | Thailand: 3-Day Program Training Course for PMMRÂ (MS-Word 29 KB) |
The following supplemental documents are from the University of Birmingham, UK, Senior Road Executives Programme, Restructuring Road Management, Birmingham, 24-29 April 2005: |
 | Cutting Costs and Improving Quality through PMMR Contracts: The Latin American and OECD Experiences (MS-Powerpoint 1.7 KB) |

| Using Micro-Enterprises to Create Local Contracting Capacity: The Latin American Experience in Road Maintenance (MS-Powerpoint 1.7 KB) |

| List of Relevant Documents of PMMRÂ (MS-Powerpoint 1.7 KB) |