Huai River Basin Flood Management and Drainage Improvement 
 
The objective of the Huai River Basin Flood Management and Drainage Improvement Project for China is to provide better and more secure protection against floods and water logging, increase farmland productivity, and reduce property losses in predominantly poor rural areas in the Huai river basin in the provinces of Jiangsu, Shandong, Anhui and Henan. There are five components to the project, the first component being flood protection and drainage improvement. Carrying out of flood protection and drainage improvement works in the project area including: strengthening of dikes; improving waterways through, inter alia, river dredging, drainage channel excavation, and river bank reinforcement and stabilization; and construction, rehabilitation, replacement and expansion of flood control works, including pumping stations, cross-dike structures, sluice gates and bridges. The second component is the disaster assessment and support system. The third component is the institutional strengthening. Strengthening the capacity of the project implementing entities in critical areas related to the project including: dike maintenance; design and construction; modern construction technologies; and data collection and decision support systems for flood forecasting systems, emergency preparedness plans and river modeling. The fourth component is the resettlement action plan implementation. Finally, the fifth component is the project management.** 
  Ultima actualizacion May 21 2013
Basic Information
Situación del proyectoActive 
Región East Asia And Pacific 
País/ÁreaChina 
Sector principal/Sector (%) Water, sanitation and flood protection (Flood protection) (65%) 
  Agriculture, fishing, and forestry (Irrigation and drainage) (28%) 
  Public Administration, Law, and Justice (Public administration- Water, sanitation and flood protection) (7%) 
Sector principal (previo)N/A  
Sector previoN/A  
Categoría ambientalA  
No. de identificación del proyectoP098078 
Bank Team Lead (Last Name, First)Jiang, Liping  
Fecha de aprobación06-JUL-2010  
Fecha de cierre31-DEC-2016  
PrestatarioP.R.CHINA  
Organismo de ejecuciónMWR AND HENAN, ANHUI, JIANGSHU AND SHANDONG PROVINCES  

Informacion financiera
numero del prestamo o credito principal #79380  
Compromiso del BIRF *200 
Compromiso de la AIF *
Compromiso del BIRF + AIF *200 
Monto a título de donación *
Costo total del proyecto *597.41 
Línea de productosIBRD/IDA 
Instrumento de financiamientoSpecific Investment Loan 

Efectos directos y objetivos en pro del desarrollo
Efectos tematicos especificos ?En apoyo del siguiente objetivo general de desarrollo
Water resource managementEnsure environmental sustainability (MDG); Environmental commons (GPG)
Natural disaster managementEmpowerment, security & social inclusion (CAP)
Rural policies and institutionsN/A (CAP)
Rural services and infrastructureN/A (CAP)
Documentos disponibles sobre el proyecto***
For a short project overview, please consult the Project Information Document if available.
 
Procurement Plan (PROP), Vol.1 of 1 -09-APR-2013 
Implementation Status and Results Report (ISRR), Vol. -01-MAR-2013 
Procurement Plan (PROP), Vol.1 of 1 -26-DEC-2012 
Procurement Plan (PROP), Vol.1 of 1 -01-DEC-2012 
Procurement Plan (PROP), Vol.1 of 1 -28-MAY-2012 
Procurement Plan (PROP), Vol.1 of 1 -25-MAY-2012 
Procurement Plan (PROP), Vol.1 of 1 -24-MAY-2012 
Procurement Plan (PROP), Vol.1 of 1 -09-APR-2012 
Implementation Status and Results Report (ISRR), Vol. -09-APR-2012 
Loan Agreement (LA), Vol. -03-NOV-2010 
Project Agreement (PRA), Vol. -03-NOV-2010 
Procurement Plan (PROP), Vol.1 of 1 -23-JUN-2010 
Project Appraisal Document (PAD), Vol.1 of 1 -26-MAY-2010 
Integrated Safeguards Data Sheet (ISDS), Vol.1 of 1 -25-MAY-2010 
Board Report (BR), Vol.1 of 1 -01-FEB-2009 
Environmental Assessment (EA), Vol.6 of 6 -01-NOV-2008 
Environmental Assessment (EA), Vol.6 of 6 -01-NOV-2008 
Environmental Assessment (EA), Vol.1 of 6 -01-NOV-2008 
Environmental Assessment (EA), Vol.1 of 6 -01-NOV-2008 
Resettlement Plan (RPL), Vol.5 of 7 -01-NOV-2008 
Resettlement Plan (RPL), Vol.3 of 7 -01-OCT-2008 
Resettlement Plan (RPL), Vol.4 of 7 -01-OCT-2008 
Resettlement Plan (RPL), Vol.7 of 7 -01-OCT-2008 
Resettlement Plan (RPL), Vol.6 of 7 -01-MAY-2008 
Resettlement Plan (RPL), Vol.2 of 7 -01-SEP-2007 
Environmental Assessment (EA), Vol.3 of 6 -01-JUL-2007 
Environmental Assessment (EA), Vol.4 of 6 -01-JUL-2007 
Environmental Assessment (EA), Vol.5 of 6 -01-JUL-2007 
Resettlement Plan (RPL), Vol.1 of 7 -01-APR-2007 
Project Information Document (PID), Vol.1 of 1 -13-DEC-2005 
 
Contratos adjudicado Informacion
 
haga clic aquíto see contract award information about this project.

*El costo total del proyecto incluye el financiamiento proporcionado por el Banco Mundial y por otras fuentes, y se expresa en millones de US$. En el caso de los proyectos activos y cerrados, se indica el monto del compromiso en el momento de la aprobacion del proyecto por el Directorio Ejecutivo. Este monte no inclye las anulaciones. En el caso de los proyectos propuestos o abandonados, se indica el monto previsto..

** El resumen del proyecto se ha tomado del documento de evaluacion inicial, el informe de evaluacion inicial, el informe de evaluacion inicial del personal o el documento del programa, y es posible que no refleje exactamente la indole actual del proyecto..

*** Project documents are posted to this website as soon as they reach certain milestones(Mas info.). For example, Project Appraisal Documents are processed and made available through this website a few days after Board approval. If you find that a report which should be here is unavailable, contactInfoshop .