LB - First Municipal Infrastructure Project 
 
The First Municipal Infrastructure Project aims to address urgent municipal works while setting the stage for gradual assumption of responsibility for municipal services at the local level. The project will, in the short term, restore selected basic municipal infrastructure to improve living conditions, and, in the medium term, set the stage for the development of the municipal sector by enabling municipalities to begin addressing local infrastructure maintenance and rehabilitation needs. The project consists of three components: a) Upgrading and rehabilitating basic municipal infrastructure will carry out a program for the rehabilitation and upgrading of essential infrastructure in all the municipalities of the Borrower, which includes constructing, upgrading, rehabilitating, and maintaining essential roads and sidewalks, retaining walls, pedestrian crossings, street lights, safety barriers, etc. b) Capacity building will develop, implement, and maintain a program for infrastructure rehabilitation, including feasibility studies, tender document preparation, subproject technical design, and maintenance programming. It will also support the strengthening of the capacity of the Ministry of Municipal and Rural Affairs. c) Project coordination unit will support provision of equipment and consultant services.** 
  Last Updated  September 20 2014
Basic Information
Project StatusClosed 
Region Middle East And North Africa 
Country/AreaLebanon 
Major Sector (Sector) (%) Water, sanitation and flood protection (General water, sanitation and flood protection sector) (45%) 
  Transportation (General transportation sector) (23%) 
  Transportation (Roads and highways) (23%) 
  Public Administration, Law, and Justice (Central government administration) (6%) 
  Public Administration, Law, and Justice (Sub-national government administration) (3%) 
Old Major SectorN/A  
Old SectorN/A  
Env CategoryB  
Project IDP050544 
Bank Team Lead (Last Name, First)Maurer, Robert  
Approval Date22-JUN-2000  
Closing Date31-DEC-2008  
Borrower/RecipientLEBANESE REPUBLIC  
Implementing AgencyMINISTRY OF INTERIOR AND MUNICIPAL AFFAIRS  

Financial
Main Loan/Credit #70260  
IBRD Commitment *80 
IDA Commitment *
IBRD + IDA Commitment *80 
Grant Amount *
Total Project Cost *100 
Product LineIBRD/IDA 
Lending InstrumentSpecific Investment Loan 

Development Outcomes And Goals
Targeted Thematic Outcomes...Supporting this Broader Dev't Goal
Urban services and housing for the poorN/A (CAP)
Municipal governance and institution buildingN/A (CAP)
Available Project Documents***
For a short project overview, please consult the Project Information Document if available.
 
Implementation Completion and Results Report (ICR), Vol.1 of 1 -01-JUN-2009 
Project Paper (PJPR), Vol.1 of 1 -27-OCT-2006 
Loan Agreement (LA), Vol. -27-JUN-2000 
Loan Agreement (), Vol. -27-JUN-2000 
Project Appraisal Document (PAD), Vol.1 -26-MAY-2000 
Project Information Document (PID), Vol.1 -08-MAR-2000 
Grant or Trust Fund Agreement (GTA), Vol. -30-JUN-1994 
Grant or Trust Fund Agreement (GTA), Vol. -30-JUN-1994 
 
Contract Award Information
 
Click here to see contract award information about this project.

*Commitment at Board in USD$ millions. Does not reflect any cancellations. Pipeline and dropped projects display the forecast amount. Total project cost includes non-Bank funding.

** The project summary is drawn from the PAD, SAR, or PGD abstract and may not accurately reflect the project's current nature.

*** Project documents are posted to this website as soon as they reach certain milestones (more info.). For example, Project Appraisal Documents are processed and made available through this website a few days after Board approval. If you find that a report which should be here is unavailable, contact Infoshop .