IR-NORTHERN CITIES WATER SUPPLY & SANITATION PROJECT 
 
The Northern Cities Water Supply and Sanitation Project will enhance the quality of life in the four northern cities of Rasht, Anzali, Sari and Babol, and will improve the operational efficiency and financial sustainability of the Water and Wastewater Companies (WWCs). The project consist of the following 10 components: component 1) will extend and improve Rasht's collection network. Component 2) will improve the service provision in Rasht through regulating the pressure and availability of water in the distribution network, as well as reduction in losses due to leakage. Component 3) will extend and improve Anzali's collection network. Component 4) will rehabilitate and extend Anzali's water distribution network with 155 km of primary and secondary distribution network. Component 5) will provide technical assistance, training and consultant services for institutional development and environmental management plan, Technical Support Unit (TSU), engineering design and construction supervision. Component 6) includes construction of a wastewater collection and treatment system in Sari. Component 7) will extend and rehabilitate Sari's distribution network. Component 8) will include: (i) the provision of 16,300 new house connections, (ii) the construction of approximately 130 km of laterals, interceptors, and trunk mains, and (iii) 6 pump and lift stations. Component 9) includes: (i) the construction of a 20,000 m3 ground reservoir and pumping station, (ii) the replacement of 40 km of existing pipe mains, (iii) extension of the network with an additional 32 km of mains, and (iv) some 125 km of lateral pipes and 4,500 water metes. Component 10) will provide technical assistance, training and consultant services for institutional development, technical support, engineering design and construction supervision.** 
  Last Updated  November 26 2009
Basic Information
Project StatusActive 
Region Middle East And North Africa 
Country/AreaIran, Islamic Republic of 
Major Sector (Sector) (%) Water, sanitation and flood protection (Sewerage) (70%) 
  Water, sanitation and flood protection (Water supply) (30%) 
Old Major Sector Urban Development  
Old Sector Urban Management  
Env CategoryA  
Project IDP076884 
Bank Team Lead (Last Name, First)Bakalian, Alexander E.  
Approval Date26-MAY-2005  
Closing Date31-DEC-2010  
BorrowerGOVERNMENT  
Implementing AgencyGUILAN WATER AND SEWERAGE COMP. (WWC) AND THE MAZANDARAN WWC  

Financial
Main Loan/Credit #47830  
IBRD Commitment *224 
IDA Commitment *
IBRD + IDA Commitment *224 
Grant Amount *
Total Project Cost *343.5 
Product LineIBRD/IDA 
Lending InstrumentSpecific Investment Loan 

Development Outcomes And Goals
Targeted Thematic Outcomes...Supporting this Broader Dev't Goal
Pollution management and environmental healthEnsure environmental sustainability (MDG); Environmental commons (GPG)
Water resource managementEnsure environmental sustainability (MDG); Environmental commons (GPG)
Access to urban services and housingN/A (CAP)
Other urban developmentN/A (CAP)
Other human developmentHealth (CAP)
Available Project Documents***
For a short project overview, please consult the Project Information Document if available.
 
Procurement Plan (PROP), Vol.1 -24-NOV-2009 
Procurement Plan (PROP), Vol.1 -24-OCT-2009 
Loan Agreement (), Vol. -27-JUN-2005 
Project Appraisal Document (PAD), Vol.1 -28-APR-2005 
Resettlement Plan (RPL), Vol.1 -01-APR-2005 
Integrated Safeguards Data Sheet (ISDS), Vol.1 -29-MAR-2005 
Board Report (BR), Vol.1 -01-MAR-2005 
Environmental Assessment (EA), Vol.1 -01-MAR-2005 
Environmental Assessment (EA), Vol.2 -01-FEB-2005 
Environmental Assessment (EA), Vol.3 -01-FEB-2005 
Integrated Safeguards Data Sheet (ISDS), Vol.1 -04-JAN-2005 
Project Information Document (PID), Vol.1 -06-DEC-2004 
 
Contract Award Information
 
Click here to see contract award information about this project.

*Commitment at Board in USD$ millions. Does not reflect any cancellations. Pipeline and dropped projects display the forecast amount. Total project cost includes non-Bank funding.

** The project summary is drawn from the PAD, SAR, or PGD abstract and may not accurately reflect the project's current nature.

*** Project documents are posted to this website as soon as they reach certain milestones (more info.). For example, Project Appraisal Documents are processed and made available through this website a few days after Board approval. If you find that a report which should be here is unavailable, contact Infoshop .