 |
| Attention : The Projects Database's project details page has been redesigned. Please
click here to view the redesigned page. |
 |
| Arsenic Mitigation Water Supply
|
![]() |
| |
![]() |
|
The Arsenic Mitigation - Water Supply Project for Bangladesh reduces mortality and morbidity in rural and urban populations caused by arsenic contamination of the country's groundwater. The project aims to significantly reduce the quantity of arsenic ingested; increase access to a sustainable safe water supply; and increase the percentage of treated arsenicosis patients in the project areas. There are three components. The first, on-site mitigation, 1) provides technical assistance, training, and logistical support to build capacity and operate the project management unit (PMU); 2) implements community interventions by developing a community-based organization capable of supplying short-term, alternative water supply/sanitation infrastructure; 3) prepares and implements a technical and financial proposal; and 4) audits, evaluates, and monitors project impact and groundwater quality. The second component strengthens the PMU's capacity to collect, manage, and evaluate data for water quality, arsenic contamination, and socioeconomic conditions; undertakes well screening and community education; and funds studies and research on participatory planning, implementing appropriate technology, cost recovery, appropriate technology for testing and treating arsenic in groundwater, and land use/arsenic interactions. The third component, institutional strengthening, builds capacity in arsenic mitigation and participatory water supply and sanitation.**
|
 |
 |
 |
 |
|
| |
Last Updated May 22 2013
|  |
Available Project Documents***
For a short project overview, please consult the Project Information Document if available.
|
 |
| |
|
|
| |
 |
 |
 |
| Contract Award Information |
 |
| |
| Click here to see contract award information about this project. |
|
|
*Commitment at Board in USD$ millions. Does not reflect any cancellations. Pipeline and dropped projects display the forecast amount. Total project cost includes non-Bank funding.
** The project summary is drawn from the PAD, SAR, or PGD abstract and may not accurately reflect the project's current nature.
*** Project documents are posted to this website as soon as they reach certain milestones (more info.). For example, Project Appraisal Documents are processed and made available through this website a few days after Board approval. If you find that a report which should be here is unavailable, contact Infoshop .
|
|
|
|