Click here for search results
Attention : The Projects Database's project details page has been redesigned. Please click here to view the redesigned page.
Water Conservation Project 
 
The Water Conservation Project for China enhances the beneficial use of water resources, agriculture production capacity, and farmer incomes by: increasing the value of agriculture production per unit of consumed water through increasing yields and reducing non-beneficial water losses; and establishing mechanisms for sustainable use and management of water resources in irrigated areas. Twenty-seven counties from the provinces of Hebei and Liaoning and the municipalities of Beijing and Qingdao have been identified and all of the subprojects have been prepared at the feasibility level. There are four project components: 1) Irrigation and drainage works and onfarm systems, including canal lining, low-pressure pipes, drains, wells, small structures, surface irrigation improvements, sprinkler systems, and micro-irrigation systems; 2) Agriculture support and services, including land-leveling, non-tillage in the dry season, deep plowing in the rainy season, and soil fertility improvements such as using green manure and stalk, organic and plastic mulching, cropping pattern adjustments, seeds improvement and development of drought resistent varieties, balanced fertilzation, and improved planting and cultivation techniques; 3) Forestry and environmental monitoring; and 4) Institutional development, including training, technical assistance and research as well as establishing and strengthening operation and maintenance entities made up mostly of water users.** 
  Last Updated  November 28 2014
Basic Information
Project StatusClosed 
Region East Asia And Pacific 
Country/AreaChina 
Major Sector (Sector) (%) Agriculture, fishing, and forestry (Irrigation and drainage) (64%) 
  Agriculture, fishing, and forestry (General agriculture, fishing and forestry sector) (25%) 
  Public Administration, Law, and Justice (General public administration sector) (7%) 
  Agriculture, fishing, and forestry (Forestry) (4%) 
Old Major SectorN/A  
Old SectorN/A  
Env CategoryB  
Project IDP056516 
Bank Team Lead (Last Name, First)Jiang, Liping  
Approval Date19-DEC-2000  
Closing Date30-JUN-2006  
Borrower/RecipientPRC  
Implementing AgencyMINISTRY OF WATER RESOURCES  

Financial
Main Loan/Credit #45890  
IBRD Commitment *74 
IDA Commitment *
IBRD + IDA Commitment *74 
Grant Amount *
Total Project Cost *185.67 
Product LineIBRD/IDA 
Lending InstrumentSpecific Investment Loan 

Development Outcomes And Goals
Targeted Thematic Outcomes...Supporting this Broader Dev't Goal
Land administration and managementEnsure environmental sustainability (MDG); Environmental commons (GPG)
Water resource managementEnsure environmental sustainability (MDG); Environmental commons (GPG)
Other rural developmentN/A (CAP)
Available Project Documents***
For a short project overview, please consult the Project Information Document if available.
 
Brief (BRI), Vol.1 -01-OCT-2008 
Implementation Completion and Results Report (ICR), Vol.1 -27-MAR-2007 
Loan Agreement (), Vol. -09-FEB-2001 
Project Agreement (PRA), Vol. -09-FEB-2001 
Grant or Trust Fund Agreement (GTA), Vol. -09-FEB-2001 
Loan Agreement (LA), Vol. -09-FEB-2001 
Project Agreement (), Vol. -09-FEB-2001 
Project Appraisal Document (PAD), Vol.1 -16-NOV-2000 
Project Information Document (PID), Vol.1 -04-AUG-2000 
Environmental Assessment (EA), Vol.1  -31-JUL-2000 
Environmental Assessment (EA), Vol.4  -31-JUL-2000 
Environmental Assessment (EA), Vol.2  -31-JUL-2000 
Environmental Assessment (EA), Vol.3 -30-JUN-2000 
 
Contract Award Information
 
Click here to see contract award information about this project.

*Commitment at Board in USD$ millions. Does not reflect any cancellations. Pipeline and dropped projects display the forecast amount. Total project cost includes non-Bank funding.

** The project summary is drawn from the PAD, SAR, or PGD abstract and may not accurately reflect the project's current nature.

*** Project documents are posted to this website as soon as they reach certain milestones (more info.). For example, Project Appraisal Documents are processed and made available through this website a few days after Board approval. If you find that a report which should be here is unavailable, contact Infoshop .
Projects Home | Advanced Projects Search | Contract/Contractors Search | Browse | Help/FAQ
Disclaimer: Terms & Conditions